Custom Warehouse CAD Layouts
Full 2D and 3D CAD architectural layout designs accounting for forklift aisle turn radiuses, ceiling clear heights, column grids, building fire sprinkler flues, and floor slab load-bearing capacities.
SolidFort Storage Equipment Co., Ltd. provides end-to-end industrial warehouse storage solutions tailored to global logistics centers, cold chain facilities, manufacturing plants, and distribution operators. We combine high-grade structural steel roll-forming with rigorous mechanical design principles, offering engineering solutions certified to AS4084, RMI (ANSI MH16.1), and FEM 10.2.02 international standards.
Whether you require high-density radio shuttle racking, versatile selective pallet racks, or custom cantilever systems for oversized materials, our in-house engineering team works directly with your operational blueprints to maximize warehouse volumetric storage capacity while maintaining absolute safety.
Full 2D and 3D CAD architectural layout designs accounting for forklift aisle turn radiuses, ceiling clear heights, column grids, building fire sprinkler flues, and floor slab load-bearing capacities.
Engineered rack loading calculations verified through Finite Element Analysis (FEA) to ensure structural safety under dynamic loading, full seismic acceleration, and accidental forklift collisions.
Container-optimized bundle packaging designed specifically for ocean freight protection. Complete logistics documentation under FOB, CIF, or DDP terms with customs-cleared container loading plans.
Our heavy-duty steel racking components are manufactured from premium Q235B and Q355B cold-rolled steel coils, designed to deliver maximum structural integrity under continuous operation.
| Racking System Type | Maximum Load Capacity | Compliance Standards | Surface Finish Options | Recommended Application |
|---|---|---|---|---|
| Selective Pallet Racking | Up to 4,500 kg per beam level | AS4084, RMI ANSI MH16.1, FEM 10.2.02 | Epoxy Powder Coat / Pre-Galvanized | 100% SKU selectivity, general distribution |
| Drive-In / Drive-Thru Racking | Up to 1,500 kg per pallet position | ISO9001, AS4084, FEM | Heavy-Duty Powder Coat / Hot-Dip Galv | Homogeneous bulk stock, cold storage |
| Radio Shuttle Racking | Up to 2,000 kg per shuttle cart | CE Certified Shuttle, AS4084, RMI | High-Durability Powder Coat | Automated high-density deep-lane storage |
| Cantilever Racking | Up to 6,000 kg per upright column | ANSI / RMI, FEM Standards | Powder Coating / Hot-Dip Galvanized | Pipes, timber, aluminum extrusions, steel plates |
A structured, engineer-led process designed to ensure structural compliance, accurate production timelines, and smooth site installation.
Collection of warehouse floor plans, pallet dimensions, unit loads, forklift specifications, and seismic criteria.
Submission of customized CAD layout drawings, structural load plaques, and exact pallet position count calculations.
ISO9001-certified roll-forming, automatic robotic welding, shot blasting, electrostatic powder coating, and quality inspection.
Container packing optimization, export shipping dispatch, detailed assembly instruction manuals, and remote structural technical support.
Technical guidance directly from the engineering office at SolidFort Storage Equipment Co., Ltd.
All racking systems produced by SolidFort Storage Equipment Co., Ltd. are designed according to recognized international structural engineering codes including AS4084 (Australia), RMI ANSI MH16.1 (USA), and FEM 10.2.02 (Europe). We perform rigorous component testing, frame stability analysis, and load capacity verifications for every custom order.
Yes. As a direct manufacturer with custom roll-forming machinery, we produce upright frames up to 15 meters high, custom beam spans, non-standard depth profiles, and specialized wire mesh decking to match your exact unit load dimensions and building footprint.
We exclusively utilize prime structural cold-rolled steel coils (Q235B and high-strength Q355B equivalent to grade SS400/ST52). Raw materials are supplied with full Mill Test Certificates (MTC) verifying yield strength, tensile strength, and chemical composition.
Standard selective pallet racking components typically ship within 10 to 15 days from deposit confirmation. Large-scale engineered project solutions generally ship in approximately 30 days depending on powder coating and galvanizing requirements.